Physical Progress | The project constrauction has been completed. |
Satellite image | dam spillway |
Agenda(s) | Spillway Flip Bucket rectification –sides spillway slope stabilization |
Location | Khuzestan province |
Renovating and protecting area between two buckets of Shaheed Abbas pour dam aimed at reconstructing the damaged flip bucket and stabilization and re-enforcing the sides spillway of dam to prevent probable falling and erosion when the second power plant structure outlet span of spillway gates are opened