loading
  • No. 23 - 29th St. - Saadat Abad Ave. Tehran - 19 98 81 66 41 - Iran
  • +98 21 88 68 68 80
  • +98 21 88 68 67 60
  • info@omran-maroon.com
  • Reg No.: 16 25 25

    National ID: 10 10 20 51 467

    Economy Code: 41 11 51 57 85 71

company logo Kanisib Dam and Related Installation
Physical Progress Land Delivery

Project location is 120 Km away from Urmia city in west of West-Azerbaijan province. Distances of Kanisib dam and Badin Abad Diversion Tunnel from Pranshahr city are respectively 15 and 20 Km.

The project consists of 4 subcategories, kanisib Dam with 52.5 m height, Badin Abad concrete diversion dam with 4,5m Length and 100m length, water canal with 6 Km length and Sediment Collector Dam of soil-cement type with 12 m height and related access roads. Kanisib dam, of earth-fill type with a clay core, is constructed against Glass River. Kanisib Spillway and flood discharge system are located in the right bank and reservoir volume is estimated 327 million cubic meter at the level of 1380.

Contract of the project was awarded over to Omran Maroon Eng. Co. in July of 2016.

Related Pictures