loading
  • No. 23 - 29th St. - Saadat Abad Ave. Tehran - 19 98 81 66 41 - Iran
  • +98 21 88 68 68 80
  • +98 21 88 68 67 60
  • info@omran-maroon.com
  • Reg No.: 16 25 25

    National ID: 10 10 20 51 467

    Economy Code: 41 11 51 57 85 71

Home

company logo Kanisib Dam and Related Installation

In Progress

The project consists of 4 subcategories, kanisib Dam with 52.5 m height, Badin Abad concrete diversion dam with 4,5m Length and 100m length, water canal with 6 Km length and Sediment Collector ...

company logo Abyek Cement Factory- Line 2

Completed

The project is consist of execution of development plan of the second line of Abyek cement factory as a separate part from existing structures. Project main structures are Material Mill, Pre-heater ...

company logo Maryam Commercial Complex

Completed

Maryam Commercial Complex with 126,000 m2 construction area which is located in the populated and highly trafficked urban area of Tehran city in intersection of Shariati St. and Police St. consists of 7 under ...

company logo Behbahan Cement Factory - Cap. INCR

Completed

This project is located in Khuzestan province, inside Behbahan cement factory. This contract consists of construction of FNDs and steel structures of kiln feed and bay filter which has turned over to ...

company logo Sangtuda-2 Dam and Hydro-Power Plant

Completed

Sangtuda-2 Dam and Hydropower Plant is located in Tajikistan. The contract has been turned over to Omran Maroon Eng. Co. on 2007/07/25 issued with letter No. 400/7008 for construction of the Temporary ...

company logo Abivard Diversion Dam (Zanglanlu)

Completed

The aim of this project is transferring water from Zangelanlu drainage area to Shurkal drainage area and watering Dargaz Southeast lands and finally storing oversupply water for watering Lotf ...