company logo Ahvaz- Andimeshk Road Rehabilitation

Completed

Asphalt paving improvement of 75 km of Ahvaz-Andimeshk, round trip totally 150 km including technical buildings, road shoulders, U-turns and ....

company logo Water Transfer Project from Tunnel to the Reservoir of ABIVARD Dam (ESPIAN)

Completed

The main purpose of the project is construction of water transmission channel to Abivard reservoir dam and flood control to prevent damage to agricultural lands due to rising elevation of the river ....

company logo ABIVARD water transfer tunnel and diversion dam (ZANGELANLU)

Completed

This project with goal of water transfer to Shourkal area from Zanglanlou and irrigation south-east of Dargaz and finally storage of extra water and irrigating Lotfabad agricultural lands constructed in 50 Kilometers to south-east of Dargaz city.

company logo Excavation and Grouting of the Galleries and Grout Curtain of Karoon -4 Dam

Completed

Karun-4 power plant and Reservoir Dam is located in Chahar Mahal Bakhtiari Province of Karun River with the aim of supplying hydroelectric energy and upstream flood control of Karun-3 dam.

company logo Complementary operation of SHAHID ABBASPOUR Second Hydro Power Plant

Completed

Second Power Plant of Shaheed ABBASPOUR Dam located in Khuzestan province with capacity of 1000 MW consisting of 4*250 MW units. This part of contract consists repairing main sealing and power plant cavern (with grouting of cement and chemical components), ....

company logo Renovating and Protecting Side Slopes of SHAHID ABBASPOUR Dam Spillway

Completed

Renovating and protecting area between two buckets of Shaheed Abbas pour dam aimed at reconstructing the damaged flip bucket and stabilization and ...