Physical Progress | The project constrauction has been completed. |
Agenda(s) | Increasing production capacity from 5500 to 7500 tons a day |
Location | Ghazvin province |
This project includes construction of the second production line of Abyek cement factory were executed simultaneously with the operation of first line.
Project main structures are Material Mill building, Pre-Heater and its associated structures. Cooling Tower, ID fan, Cooler, Furnace and its platform, Third air pipe, Material Transfer Gallery between Material Mill Feed and Material Mill to the Kiln Feed, Clinker Transfer Tunnel, Steel Structure between Pre-Heater and Ceiling of Material Silos, Power Substations, Facilities channel and other structures.